CONSTRUCTION OF W.P.P. (Wind Power Plant) WIND FARM "PRASSA-KAMPOS POLEMOU" TOTAL OUTPUT CAPACITY 1.8 MW (INSTALLED 2.7 MW) at the location "Kampos Polemou – Prassa", Municipality of Tinos, South Aegean Region
As part of the implementation of the "Prassa – Kampos Polemou" wind farm construction project, TopograF provided integrated topographic support services, contributing substantially to the successful development of a Renewable Energy Sources investment across an area of approximately 40 acres. The project is part of the strategy to utilize the region's wind potential and strengthen sustainable energy production.

Implementation took place in 2019 and included the installation of three wind turbines over 70 meters in height, in an area with intense morphological relief and increased technical requirements. Beyond the foundation of the wind turbines, the project included a series of supportive interventions, such as the construction of assembly platforms, as well as landscaping work in the surrounding area, which required a high level of precision and coordination.
TopograF undertook the complete topographic monitoring and support for all stages of the earthworks and construction. The services included the staking out of the wind turbine positions according to the approved plans, the precise definition of the axes and excavation limits, as well as continuous elevation control for the formation of the foundation levels and the surfaces of the working platforms.
Particular emphasis was placed on geometric precision during the positioning of the anchor bolts and the wind turbine base elements, as well as on monitoring the concreting works to ensure full compliance with the project's technical specifications. At the same time, landscaping works were supported, ensuring the correct implementation of the designs and the functional completion of the infrastructure.
The TopograF team maintained a daily presence at the construction site, utilizing modern high-precision geodetic equipment and applying best practices for surveying and control. Close cooperation with the other technical crews and supervising engineers contributed to the seamless progress of the works and the timely resolution of technical challenges related to the specific conditions of the area.
Upon completion of the works, final surveys were conducted and the full topographic documentation was delivered, confirming the construction accuracy and supporting the subsequent stages of installation and operation of the wind farm.